Page 11 - Nitro Madness Magazine Fall 2021
P. 11
locate the pair. When he got them,
he assessed that they were not up
to his strict standards. On a phone
conversation with Art Chrisman,
he told him about the valve covers
and Art said he would redo them.
Art also supplied the Donovan
rocker arms that were resting
comfortably under his workbench.
Venolia pistons and rods round
out the internals. Mike Sforza also
built the original Schiefer clutch
assembly. Once all these pieces
came together Billy started the
final assembly.
The rear wheels are original
Halibrand wearing 1300x16 M&H
Cackling at the 2013 NEHRR with Segrini in the car.
slicks. The wheels sport Airheart
spot brakes that were tested at
1100 lbs. of pressure. The interior
was stitched in black leather by
George Frank Upholstery. Simpson
supplied the seat belts and twin
parachutes. The body panels were
then shipped to Circus Paints in
New Jersey so Bob Gerdes could
work his magic with DuPont Candy
Apple Red. Then Julian “Mr. J”
Braet took care of the lettering,
graphics and gold leaf.
Final assembly was scheduled
for late November and Pat called
Billy to say he would be flying in
to oversee the assembly. He’d be in
Bobby watches oil pressure as Billy starts the car. town for about a week. Personally
I was pretty excited as I was going
to Billy’s shop in November of 2007 the inside by Billy and the engine to photograph the assembly and
where they awaited final assembly. was shipped to Mc Betts on Long get to meet and hang out with this
Island to install the Milodon caps
In the meantime Billy was as well as new cam bearings. Billy’s legend. Sadly it all was not to be
gathering parts for the motor. old pal Mike Sforza degreed the as Pat was stricken with an aortic
He found a 392 Chrysler Hemi cam and Art Chrisman supplied aneurysm and spent the following
from a 1958 Imperial with only the billet polished 6-71 blower four months in hospitals from Idaho
40k miles on it. Billy had to buy and he redid the valve covers too. to California. It was a testament
6 magnetos until he got the right The aforementioned valve covers to his tenacity that he was able to
Schieffer unit. It was then shipped were purchased from a racer in last as long as he did. Most who
to Tom Cirello for the rebuild. The Arizona. It took Billy 9 months to are stricken with this do not. Faced
Mondello heads were painted on with the fact that he would never
FALL 2021 | NITRO MADNESS MAGAZINE 11