Page 11 - Nitro Madness Magazine Fall 2021
P. 11

locate the pair. When he got them,
                                                                                  he assessed that they were not up
                                                                                  to his strict standards. On a phone
                                                                                  conversation with Art Chrisman,
                                                                                  he told him about the valve covers
                                                                                  and Art said he would redo them.
                                                                                  Art also supplied the Donovan
                                                                                  rocker arms that were resting
                                                                                  comfortably under his workbench.
                                                                                  Venolia pistons and rods round
                                                                                  out the internals. Mike Sforza also
                                                                                  built the original Schiefer clutch
                                                                                  assembly. Once all these pieces
                                                                                  came together Billy started the
                                                                                  final assembly.

                                                                                    The rear wheels are original
                                                                                  Halibrand wearing 1300x16 M&H
        Cackling at the 2013 NEHRR with Segrini in the car.
                                                                                  slicks. The wheels sport Airheart
                                                                                  spot brakes that were tested at
                                                                                  1100 lbs. of pressure. The interior
                                                                                  was stitched in black leather by
                                                                                  George Frank Upholstery. Simpson
                                                                                  supplied the seat belts and twin
                                                                                  parachutes. The body panels were
                                                                                  then shipped to Circus Paints in
                                                                                  New Jersey so Bob Gerdes could
                                                                                  work his magic with DuPont Candy
                                                                                  Apple Red. Then Julian “Mr. J”
                                                                                  Braet took care of the lettering,
                                                                                  graphics and gold leaf.

                                                                                    Final assembly was scheduled
                                                                                  for late November and Pat called
                                                                                  Billy to say he would be flying in
                                                                                  to oversee the assembly. He’d be in
        Bobby watches oil pressure as Billy starts the car.                       town for about a week. Personally
                                                                                  I was pretty excited as I was going
        to Billy’s shop in November of 2007   the inside by Billy and the engine   to photograph the assembly and
        where they awaited final assembly.   was shipped to Mc Betts on Long      get to meet and hang out with this
                                             Island to install the Milodon caps
          In the meantime Billy was          as well as new cam bearings. Billy’s   legend. Sadly it all was not to be
        gathering parts for the motor.       old pal Mike Sforza degreed the      as Pat was stricken with an aortic
        He found a 392 Chrysler Hemi         cam and Art Chrisman supplied        aneurysm and spent the following
        from a 1958 Imperial with only       the billet polished 6-71 blower      four months in hospitals from Idaho
        40k miles on it. Billy had to buy    and he redid the valve covers too.   to California. It was a testament
        6 magnetos until he got the right    The aforementioned valve covers      to his tenacity that he was able to
        Schieffer unit. It was then shipped   were purchased from a racer in      last as long as he did. Most who
        to Tom Cirello for the rebuild. The   Arizona. It took Billy 9 months to   are stricken with this do not. Faced
        Mondello heads were painted on                                            with the fact that he would never

                                                                                FALL 2021  |  NITRO MADNESS MAGAZINE     11
   6   7   8   9   10   11   12   13   14   15   16